Tuesday: Studio/Class - 3 hrs
Wednesday: Revising Off-site proposal - 3 hrs
Thursday: - Studio/class all day. Working with off-site stuff all day (bajillion hours)
Friday: 4 hours - cutting string sizes and taping to back of segments. Sectioning off "guy's" face (my new subject)
Sunday (today): 2 hours - hanging installation

This week I plan to translate my new subject's face into the vine charcoal installation.
I have to:
- decide where I want which segments to be in the 3-D space
- draw on the glass and work with parallax in model
- record these measurements of segments, and measurements of depth points.
- cut foam to life-size segments
- using triangle gridding system to enlarge smaller drawing onto foam segments
- tape string
- hang installation.