Sunday, January 29, 2012

1-29-12 Arambula

This week has been rather frustrating concerning metal. I have been at the steel store ordering steal rods to make the infer structure to be done this week as upon getting the metal the cuts were the wrong size so more metal has to be ordered. Main frame set to be done this week. Working on break down and set up of structure to make portable. Place found for full construction pulley system being set up in sculpture studio. Welding of metal (5hrs) took longer than needed. Also photos for images to be flashed were taken of PTSD (6hrs). to be put into video format this week.
outside stud:11
in stud: 12




No comments:

Post a Comment