So this past week was a bit of a rush/problem solving. I had originally set time to route out the mold on Thursday morning and was so excited to take time sanding all afternoon and sealing it this weekend.

But instead I had to fix some issues. The router malfunctioned and drilled a hole right through my MDF which led to me patching the hole this weekend with bondo, sanding it down and re-routing first thing Monday morning (this morning). Above is a picture of the table being routed this morning. However the depth was set incorrectly and instead of having a base of 1/2 " it is 1/16" and about to break. so now I have to order plywood and reinforce the bottom before
I can pour. So I'm set back about 1 week and half at this point. Beyond frustrating but this stuff happens I guess.

I've worked out my postcard layout and setting up that shoot for this thursday. I want it to be split up into 6 mini squares with, in each, a close up on the mouth of someone eating.
I've narrowed it down to spaghetti, sushi, burger, ice cream, raspberries and corn cob.

Slacking a little on the bench due to everything being such a struggle with the mold.. but I have harrowed in on the design of the table and bench legs to create a connection to the two. Re-measurements are needed... Ordering that material with the plywood and melamine board will happen by Wednesday.

Things are picking up pace. Fast.

Oh. hours?
Like 10 or so outside of studio?
Monday - 3
Tuesday - 6
Thursday - 6
Friday - 2
Saturday - 2
Sunday - 3