Monday, January 16, 2012

Studio Update Jan 8-15

Elyse Shapiro- Studio Update Week of January 8-15

This week in studio, I spent the majority of my time printing the outer layer of lighting fixture 1, also known as the “row of abandonment.” After putting so much work into the stencil and illustrator files, I have put the image onto two photoscreens and printed them with dye on white material. This was less successful than I would have liked due to the fact that some details are lost printing on material with threads so far from one another. To combat this problem I am going to attempt to print the same design with textile acrylic paints which do not absorb into, but sit on top of that material.

Another project/ piece I worked on this week in studio were the preview prints of the doily pattern that I have created (pictures above). I have tested the prints of this on a few different fabric types and colors. By contrasting the pattern on some and blending some on the others, I was able to see a good difference in thread count and color palate. I plan on printing the “row of abandonment” on the opposing side.

The new thing that I am creating is the inner lay

er of my first lighting fixture to stand behind the row of abandonment. This inner layer will be created on illustrator and from unique colors from Detroit. The second row has been entitled “row of occupancy” and resembles the homes in their once holistic state. The former glory of these buildings will only be seen when the light within the fixture is turned on.


In-studio hours, week 2:

Tuesday- In fibers studio, creating photo screens for screen printing and creating stencil for repeat in test doily print, 8:30-2:00 (4 ½ Hours)

Wednesday- Printing outer layer 1 with black on white material with dye, 4 PM- 8 PM (4 Hours). Work on layer 2 of lighting fixture on illustrator, 9 PM- 2 AM (4 Hours)

Thursday- All day in fibers studio printing large doily prints for experimental outer layer, 10 AM- 8 PM (10 Hours)

Total: 22 ½ hours

Jan 15th

Sorry for the late update I forgot it was not the weekend anymore and is now monday

this past week I have been working hard at contacting Shaun Jackson since he is supposed to help me with the structure of my 7ft dome. I have had only one response and hoping I will be able to schedule an appointment with him next week aka this week.

I have also been starting to write on the mercury bulbs and deconstruct them
Also later this week I have to contact the hazardous materials dispensary to dispose of the mercury


Over this past week I have spent hours in the studio finishing up my 3rd block for my 1st print and proofing it. I discovered that the color is a bit too light so in my next proof I will test a darker color. I'm now planning out my 4th block for which will complete the 1st print. I hope to have this carved by Thursday at the latest. Also I have decided to create a block of just patterns that will be part of the gallery display and work as a wallpaper and the three prints will be hung over top. The idea of having the wallpaper is to emphasize this idea of being a room and creating space.
Here are images of the finished block, detail of how the text works in the proof, and the planning of the last block.



Sorry for the late update.
I have been currently working on my rhino skills in order to make my molds for my concrete cloth. I have also been making models for my next furniture piece. Attached are some images of the models/iterations.

1/09- 1/14
Monday: 4 hours: sketching, illustrator files
Tuesday: 8 hours: laser cutting, assembly of various iterations of sketch models, attempting to work on my rhino skills.
Thursday: 2 hours: going to the reuse center seeing some wood
Friday: 4 hours: spoke to Mike Vitale and John Baird about CNC routing and assembly of the table.
I’ve also been looking up artists to reference for my thesis and am trying to fine tune exactly what I want to get out of this semester IP progress. I have narrow it down to still making 4 pieces of furniture however my goal is to have 3 pieces in the show. I am planning on working with concrete cloth and possibly light weight concrete. I’m not sure exactly if I want to work with multiple types of concrete or just one of them.





Update and logging hours

Did a bit more editing on "Walking on Eggshells" but the focus this week was "Oh, Concertina". I have confirmed the concept and art for the the video, cast the main character, and bought some supplies for the video.



















Here is a concept sketch of the main character, Concertina.

I've cast Concertina and will be filming the band performing in a studio space at some point in the future.

Hours
Tuesday :2.5 hours editing
2 hours talking to band/working on studio resources
Wednesday: 3 hours buying and researching supplies for Concertina video
Friday: Writing 1 hour
Casting 1 hours
Sunday: 1 hour working with actor on concept/prep for role



Sunday, January 15, 2012

Project Update

This week I got some more animations done, as well as tweaks and modeled the agent character.  And, (not included in the video) is the dog model rigged and ready.

Tuesday: 5 hours
Wednesday: 4 hours
Thursday: 6 hours
Friday: 8 hours
Saturday: 3 hours

Saturday, January 14, 2012

Loggin' hourz

Hey yall,
This week I did a lot of organizing for next week. I also met with a guy at the 3-D Lab in the Duderstadt who explained how his modelling software could be used to facilitate my installation design process.

On Thursday, I met with Michael Rodemer to discuss the off-site grant application process and worked on our very detailed rest of the year schedules. I also met with the IP professors to discuss the "gridding" system I will be using as suspension in my piece. Most of my day was spent on cleaning and organizing my studios. I want to get all the dust out.


So far this weekend, I have organized my art supply finances between my IP Grant and a potential SAS grant. I completed 2 grants tonight which I'm really excited about because I am usually really lazy on the weekends.

That said, I don't have any images of work. I do have a photo of an awesome photo of a sandwich I made so I will upload that.



Hours log: Week 01/09-1/14
Tuesday - 4.5 hrs
Wednesday - 3hrs
Thursday - 8:30-5pm (8 hrs ish)
Friday - 2 hrs
Saturday - 1 hr